PrimeCore Engineering

A mistake in the water systems is the most expensive kind, because a leak damages every other trade’s work. That is why every section is handed over with a hydraulic test.

What it includes
  • Hot and cold water supply with circulation
  • Drainage network, vented stacks and sub-drainage
  • Storm water system and roof outlets
  • Pump sets, pressure boosting and hydrophore stations
  • Water treatment: filtration, softening, reverse osmosis
  • Boilers and hot water storage
  • Fire water supply and reserve tanks
  • Installation of sanitary fixtures
  • Pipe insulation and condensation protection

On handover you receive: hydraulic test certificate · tightness report · as-built drawings

Design and installation of building engineering systems — from the first drawing to full handover.

2026 • PrimeCore Engineering