PrimeCore Engineering

Power supply has to work today and still work when the load grows. That is why we design the scheme with future reserve built in.

Every facility is handed over with instrument test reports.

What it includes
  • External power supply, feeder lines and cable routes
  • Transformer substations and main distribution boards
  • Floor, technical and common area panels
  • Equipment selection and protection selectivity
  • Backup power: diesel generators, ATS, UPS systems
  • Earthing system, lightning protection and equipotential bonding
  • Interior, exterior, emergency and escape route lighting
  • Power and socket circuits, supply to process equipment
  • Installation of cable trunking, trays and cable containment
  • Power supply to mechanical systems (HVAC, ventilation, pumps)

On handover you receive: insulation resistance report · earthing resistance report · loop impedance measurements · load balance report · as-built drawings

Design and installation of building engineering systems — from the first drawing to full handover.

2026 • PrimeCore Engineering